top of page
MALTZ CORNER_edited.png

Maltz Jupiter Theatre

Jupiter, FL

Project        

Maltz Jupiter Theatre

Location

Jupiter, FL

Project Type

Regional Theatre
 

Client

Maltz Jupiter Theatre Group

Completion

2023

Size

63,650 SF

About Maltz

This renovation elevates the theatrical experience from the exterior inward. Originally built in 1979, the three-story, 63,650 SF community theatre now serves as a modern not-for-profit regional production venue where all shows are created on site. The design introduces a new back-of-house, vertical circulation connecting stage levels, a second flex theatre, and a Conservatory of Performing Arts. A dramatic three-story glass curtain wall reveals rehearsal and costume spaces, while angular forms and illuminated details echo the stage's energy.

© 2023 CSA Architects          185 NE 4th Ave, Delray Beach, FL 33483          561.276.4951

bottom of page